Monday, April 27, 2009

If you fail this quiz then you either don't take Go Transit or you wear your ipod too often.

This is an easy quiz. I challenge you all to try it and win a prize:

http://www.gotransit.com/publicroot/en/contest/railsafetyweek2009.aspx

Let's show Go Transit that their little rant before each train trip is working.

Friday, April 17, 2009

Presto and Initiatives to Get people taking bus to the train

You would think that since they are pushing hard for people to take alternate moves to the station and given the money they are spending on the Presto people at the station to ramp it up that the Lakeshore line Presto program would be moving at high speed.

I asked one of the representatives about the Burlington Transit and she told me that Bronte Station will be getting it first sometime in 2010 and then it will slowly roll out from there. The milton line has had it for what seems ages now while the rest of us wait. Wouldn't it make sense to roll it out at Oakville Station since there are definite parking problems there. Bronte station is the secondary station so it doesn't necessarily need it. How about Clarkson or Port Credit since there are a lot of bus connections and limited parking.

I hope someone at Presto and Metrolynx is reading this and takes heed. This is where the real need is not just Bronte. Think about it too, at Oakville you have Via rail. Wouldn't it be amazing if you could tie Via into Presto too?

I look forward to your comments.

Friday, April 03, 2009

Metrolynx and Go Transit Merging

That is actually quite funny since Go Transit runs little more than customer service.
All the major stuff is done by CN/CP or Bombardier. But I guess merging them will get rid
of some of those politicians trying to get in the way. Possibly Metrolynx can merge with CN and
produce efficiency there. The issue here is switch optimization, politics over whether CN or Go Transit owns the new tracks. Well if Metrolynx owned them both, no problem no fight.

I look forward to the merger and hope Metrolynx realizes the next move is taking over CN and possibly VIA.

I look forward to your opinion in this matter.